|
|
||||||||
![]() |
|
|||||||
|
|
||||||||
|
Taeyoung Building - Seoul
Once again, we received an order for glass lifts in a new building of the SBS Holding.
As in case of the first building the SBS Broadcasting Center our design and quality in the new building were convincing. This gracile lift system farms a harmonic entity and represents the results of medern architecture. |
|
|||||||
|
|
|
|||||||
|
|
||||||||
|
|
|
|||||||
|
|
||||||||
|
Technical details:
3 Elevators
Rated load 1.250 kg
14 stops
Travel 75 m
Rope drive
Rated speed 1.60 m/s
Build in 2007
|
|
|||||||
|
|
||||||||
|
|
||||||||
|
|
||||||||
![]() |
|
|||||||
|
|
|
|
|
|
|
|
|
|

